question

Upvotes
Accepted
38.1k 71 35 53

MRN Webinar Jan 31: Is there anyway of matching the old feed and the new (Elektron) when we are preparing to migrate on our end? We want to make sure that we are not losing/getting more stories because of the migration.

Is there anyway of matching the old feed and the new (Elektron) when we are preparing to migrate on our end? We want to make sure that we are not losing/getting more stories because of the migration.

elektronrefinitiv-realtimeelektron-sdkmrn
icon clock
10 |1500

Up to 2 attachments (including images) can be used with a maximum of 5.0 MiB each and 10.0 MiB total.

1 Answer

Upvotes
Accepted
38.1k 71 35 53

Clients migrating from the old feed to the new one will be allowed to run the two in parallel in order to get comfortable with the messages on each and the metadata. The two guides are not 100% comparable, but you can re-create the id in MRN_STORY using the altId, versionCreated, takeSequence, and urgency. It may vary a bit: versionCreated may be off by 1 second, and takeSequence may be off by 1 or 2 for alerts.

icon clock
10 |1500

Up to 2 attachments (including images) can be used with a maximum of 5.0 MiB each and 10.0 MiB total.

Click below to post an Idea Post Idea